Report 2 (Williamson): Building Remedial Report
The second monthly report from John Williamson Inc., dated 6 December 2011. This report notes that work has started on the south side of the building. Attached to the report is a Christmas card with the note that there will be no construction work performed between 23 December and 3 January.
Posted on January 24, 2012 at 09:54 by Admin · Permalink
In: Construction · Tagged with: building repair, john williamson inc., williamson reports
In: Construction · Tagged with: building repair, john williamson inc., williamson reports