Possible power surges during construction
I contacted John Williamson with respect to his caution about possible power surges during construction. He clarified that the possibility of a power surge in a suite would only be present during work on that suite’s balcony or deck. This is not something that is a possibility building-wide for the duration of the construction. He also reiterated that there would be 72 hours’ notice before work begins outside a particular suite.
Posted on October 9, 2011 at 09:06 by CraigH · Permalink
In: Construction · Tagged with: building repair, john williamson inc.
In: Construction · Tagged with: building repair, john williamson inc.